- 420 berths with electrical and water connections (the sea depth varies between 2.5 and 8 meters within the marina, the depth on the external side of the breakwater is 10 m to moor mega yachts)
- Electrical connections with the power of 16 A; 32 A; 63A; 125A; 250A and 800A
- 200 dry berths
- Hangar for vessels
- Reception
- Service
- 60-ton travel lift for hoisting and lowering vessels
- 60-ton carello for safe road transport of vessels
- 40-ton carello for safe vessel transport
- 5-ton lift
- Sanitary facilities with showers for the marina guests
- Electric vehicle charging station
- Separate sanitary facilities for vessel owners
- Sanitary facilities for persons with disabilities
- Complex with a 25m indoor swimming pool
- Sailing club with facilities for commercial and sports regattas, and the à la carte Spinnaker Restaurant
- Nautic Restaurant
- BavAdria Cafe Bar
- Supermarket
- Shop with nautical equipment
- Luggage storage
- 437 parking spots
- Free WiFi
- Self-service laundry
- Weather station
* New electric vehicle charging station
The new electric vehicle charging station is ready for you in the parking lot next to the indoor pool. Each charging station has 22 KW of power, and is following the IEC 62196 – type 2 standard. All users will have to get a T-RFID id card, which they can obtain from the pool reception. The creation of the EV charging station is one of the steps that Marina Kaštela is taking to promote a greener living and reduce the carbon footprint of the company, its clients and the Kaštela community.
* Services / facilities that will be available after the complete development of the marina:
- Vacuum sewage pump system (planned for 2020.) *
- 200 ton travel lift (planned for 2020.) *
- Hotel with congress center*
- Gas station with 5 fuel aggregates in the Service zone of the marina (planned for 2020.) *